The Code is part of a larger project process
Ontario’s Building Code sets technical requirements for many aspects of construction, while municipalities handle permits, inspections, and enforcement through their building officials. A customer should treat the Code as one part of the project process—not as a replacement for the approved drawings or the municipality’s direction.
MSP can perform excavation and site-support work within the scope assigned by the project’s responsible contractor or design team. We do not issue permits, approve building designs, perform municipal inspections, or certify that a project complies with every requirement.
Questions to ask before excavation
Before hiring an excavation contractor, confirm:
- Which drawings, elevations, and revisions control the work
- Who is responsible for permit applications and inspection notifications
- Whether soil, groundwater, rock, or foundation information is available
- Which materials and backfill requirements apply
- How changes in field conditions will be documented and approved
Why project-specific advice matters
The right excavation depth, width, protection, drainage approach, and backfill sequence depend on the project design and site conditions. Avoid relying on generic internet dimensions when the project has an engineer, designer, septic professional, or municipal requirement that controls the work.