FAQs · Wasaga Beach & Simcoe County
Excavation questions answered before you call
Straight answers about photos, access, materials, timing, locates and permits for excavation, gravel driveway and drainage work.
Before you call or send photos
What should I send for a quote?
The town or address, what you want done, and two to four photos: the whole area from a distance, the problem spot up close, and the way a machine gets in. A rough size (paced off is fine) helps. Builders should send drawings, the site plan and a target start date.
Can I get a rough price from photos?
Often, yes, for simple jobs like a pad, a driveway top-up or a short trench. Bigger or less clear jobs usually need a short site visit before a firm written quote. Either way, Nicolaas tells you which it is.
Do you charge for a site visit?
Ask when you call. Whether a visit is needed, and what it involves, depends on the size and location of the job. MSP confirms it before booking so there are no surprises.
What happens after I send the form?
Nicolaas reviews the details and replies by phone or email with questions, a ballpark, or a time for a site visit. Quotes are in CAD and list the scope, materials and what is included.
Site access and materials
How much room does a machine need to get in?
Many residential jobs can be done with a compact machine through a gate or side yard, but width, slope, soft ground, overhead wires, trees and septic beds all matter. Send a photo of the route in and the narrowest point, and Nicolaas will tell you what fits before anything is booked.
Will the machine damage my lawn or driveway?
Any machine leaves some marks, especially on soft or wet ground. The route in, ground protection and clean-up are agreed before work starts, so you know what to expect.
Who supplies the gravel, topsoil or fill?
Either. MSP can arrange and place material, or place material you have ordered. The quote states which materials are included, how much, and who orders them.
What happens to the dirt that comes out?
It can stay on site to be spread or used for grading, or be hauled away with MSP's dump trailer. Tell MSP your preference; disposal or haul-away is listed in the quote.
Does MSP own the excavator?
MSP owns a dump trailer and a 40 ft flat deck trailer. Nicolaas operates customer-supplied or rental machines, roughly 5 to 30 tonnes, matched to the job. The quote states which machine is used and who supplies it.
Timing and planning for spring
When is the best time for excavation and grading?
When the ground isn't frozen or saturated, typically late spring through fall. Some digging can happen in winter, but grading, driveways and drainage work best on thawed, drier ground.
Should I contact you in winter for spring work?
Yes. Send photos and the address now and choose “Spring 2027” as the timing on the quote form. Nicolaas can look at it and talk through the scope before the spring rush. No dates are promised until the scope and ground conditions are confirmed.
How soon can a small job be scheduled?
It depends on the season, weather, ground conditions and the current schedule. MSP gives you a realistic date once the scope is clear rather than promising one up front.
What if it rains on the day?
Wet ground can mean the work is moved to protect your property and get a proper result. MSP lets you know as early as possible if the weather changes the plan.
Driveways and drainage
Can you just add gravel to my driveway?
Sometimes. If the base is sound and the surface stone is worn, a top-up and regrade is enough. Deep ruts, soft spots or water sitting on the driveway mean the base needs fixing first, or the new gravel will fail the same way.
Why does my gravel driveway keep getting potholes?
Usually water. If the driveway has no crown, or water can't drain off the sides, it soaks the base and traffic pushes it out. Fixing the crown and drainage is what makes a repair last.
Will regrading fix my wet yard or basement?
Regrading and swales deal with surface water, which is a common cause. Water coming through foundation walls, a high water table or failed weeping tile may need other trades. MSP tells you what site work can and can't fix before quoting.
Where can the water be sent?
Somewhere that won't cause problems for neighbours or the road, usually a ditch, swale or rear-yard outlet shown on the lot grading plan. If you aren't sure, the municipality or the original grading plan is the first place to check.
Locates, permits and rules
Who arranges utility locates?
Ontario One Call locates are free and must be in place before any digging. The property owner or the contractor responsible for the job requests them. Private lines, such as power to a garage, a pump line or septic pipes, aren't covered by One Call and need to be pointed out.
Do I need a permit or a grading plan?
It depends on the town and the job. In Wasaga Beach, for example, new homes, larger additions and some work near property lines need a lot grading plan from an engineer or technologist. Fill, entrances and culverts can need permits too. MSP works from the approved plans and permits you have; it doesn't issue or stamp them. See the Wasaga Beach, Stayner & Clearview and Orillia pages for local details.
Does MSP design or approve septic systems?
No. Septic design, permits and inspections go through the approval authority and a qualified, registered septic installer. MSP handles the excavation, backfill and rough grading the installer directs.
Builders and contractors
Can MSP take overflow work under a builder or general contractor?
Yes. Foundation digs and backfill, site preparation, grading, trenching and operator support are all available as defined packages, with a clear site contact, drawings and a start date.
What should builders send?
Drawings with footing sizes and depths, the benchmark, the site plan, the target start date, and what trade follows. Use the builder quote form to upload them.
Can you run our machine?
Yes. Nicolaas can operate a customer-supplied or rental machine, roughly 5 to 30 tonnes, on a defined scope. The quote states who supplies the machine, fuel and transport.
Mobile welding and repair
Do you still do mobile welding repairs?
Yes, as a secondary service for equipment, trailers and attachments, when the repair suits on-site work. Clear photos of the whole asset and the damage help decide the next step.
Can every structural repair be done without engineering?
No. Some repairs need engineering review, manufacturer direction, a shop or inspection. MSP says so up front rather than treating every failure as a simple weld.
Still have a question?
Send a few photos and the address, or call. Nicolaas will tell you whether the job is a fit and what a quote needs.